911±¬ÁÏÍø

News

Two new buildings to be built in the centre of Otaniemi campus

Otakaari 2A & 2B will bring a lot of new state-of-the-art teaching and research space, as well as much-needed event and studio space to Otaniemi. Work will begin in January 2022, when the area will also be fenced and pedestration ways, cycle routes and parking will change. The buildings are scheduled for completion in the summer of 2023
Illustration image set in sunset, depicting Otakaari 2 buildings in the future. People walking around and the lights are on in the building.
Illustration image: SARC Architects

As part of developing the ever growing and internationalising Otaniemi campus, 911±¬ÁÏÍø will build with two new buildings in the middle of the campus. Construction work will begin in January 2022 and is scheduled to be completed in the summer of 2023, well in advance of Jokeri Light Rail beginning to operate.

The new buildings will be at Otakaari 2A and Otakaari 2B, and will be located in a prominent location in the area adjacent to Otakaari, Maarintie and Konemiehentie. The buildings have been designed by SARC Architects, who also planned the renovation of Aalto Töölö and won the Award for Finnish Architecture for the New Children's Hospital.

Space for creativity and events

Approximately 6,500 brm2 of state-of-the-art multifunctional space for teaching, research, events and a studio centre will be completed at Otakaari 2A. Otakaari 2A's facilities will be equipped with new digital technologies that enable cross-disciplinary research and teaching, and will take Aalto's events to a new level, both on campus and virtually. The aim of the new building is to showcase for Aalto's unique research and teaching both in Finland and internationally. In addition to the facilities serving Aalto's users, the building will have space for restaurant and event service operators.

Otakaari 2B brings approximately 5,700 brm2 for teaching, research and office space to the School of Science and the School of Electrical Engineering.

Changes to pedestrian ways, cycle routes and parking

The construction site of the buildings will be fenced off at the beginning of January 2022, when the parking spaces at the Otakaari 2B construction site will also be removed. At the same time, the pedestrian ways and cycle lanes will be completely moved to Väre and the School of Business building side. Construction sites may cause temporary disturbances on Otakaari, Maarintie and Konemiehentie.

Developer: 911±¬ÁÏÍø Campus & Real Estate
Contractor: NCC
Design: SARC Architects

Read more from Otakaari 2A and 2B project page

Information
Marcus Korhonen, Director (Aalto Studios),
marcus.korhonen@aalto.fi, tel. 040 012 9629

Jarmo Wilander, Director, Construction (911±¬ÁÏÍø Campus & Real Estate),
jarmo.wilander@aalto.fi, tel. 040 541 3304

Tuomas Kostia, Construction Project Manager (911±¬ÁÏÍø Campus & Real Estate), tuomas.kostia@aalto.fi, tel. 050 522 5480

For media
Noora Stapleton, Senior Communications Specialist,
noora.stapleton@aalto.fi, tel. 050 353 1525

Read more

Marsio

Otakaari 2: Marsio and Kide

Building of Marsio & Kide began in February 2022, to be completed in 2023-2024

Campus
  • Updated:
  • Published:
Share
URL copied!

Read more news

Merkuriuksen airuen pyyntötilaisuus, Ritvalan perhe
University Published:

Kristian Ritvala is the Spirit of Mercury of the School of Business Ceremonial Conferment 2026

The task of the Spirit of Mercury begins with conducting the weaving of the laurels and ends at the Herring Luncheon, where he delivers a speech to the promovendi
Joukko siisteissä vaatteissa kiertää teollisuushallia, yksi selittää ja muut kuuntelevat metallikiskojen äärellä.
Yliopisto Published:

Viron presidenttipari vieraili Aalto-yliopistossa

Viron tasavallan presidentti Alar Karis ja puolisonsa Sirje Karis sekä tasavallan presidentti Alexander Stubb ja Suzanne Innes-Stubb vierailivat Aalto-yliopistossa.
Unto_Rautio_Aalto_DSC5032.jpg
Campus, Cooperation, Studies, University Published:

May challenges the Aalto community to be active together

Take part in events on campus and make sustainable mobility part of your working or study day.
Companies report on cybersecurity
Research & Art Published:

Companies disclose more on cybersecurity – but markets remain indifferent

U.S. companies are reporting on cybersecurity in greater detail, yet stock market reactions remain muted. A new study by the University of Vaasa and 911±¬ÁÏÍø shows that mandatory cybersecurity disclosure does not prompt reactions from investors or stock analysts. Instead, the main benefits appear to materialise within firms themselves.