911±¬ÁÏÍø

News

Core network failure caused power outages on Otaniemi campus

Power was cut from multiple buildings on campus but returned by 15.25
campus kampus Otakaari 1 winter talvi Kuva: Mikko Raskinen / Aalto-yliopisto

Power was out at shopping centre A Bloc (Otaniementie 12), Väre building (Otaniementie 14), School of Business building (Ekonominaukio 1), Metallimiehenkuja 2 and Metallimiehenkuja 4 but returned at around 15.00. The power returned to Undergraduate Centre (Otakaari 1) at around 15.25.

The problem was in the core network. The power failure began at 14.03.

  • Updated:
  • Published:
Share
URL copied!

Read more news

Merkuriuksen airuen pyyntötilaisuus, Ritvalan perhe
University Published:

Kristian Ritvala is the Spirit of Mercury of the School of Business Ceremonial Conferment 2026

The task of the Spirit of Mercury begins with conducting the weaving of the laurels and ends at the Herring Luncheon, where he delivers a speech to the promovendi
Group in smart clothes touring an industrial hall, one person gesturing while others listen by metal rails.
University Published:

Presidential couple of Estonia visited 911±¬ÁÏÍø

Viron tasavallan presidentti Alar Karis ja puolisonsa Sirje Karis sekä tasavallan presidentti Alexander Stubb ja Suzanne Innes-Stubb vierailivat Aalto-yliopistossa.
Unto_Rautio_Aalto_DSC5032.jpg
Campus, Cooperation, Studies, University Published:

May challenges the Aalto community to be active together

Take part in events on campus and make sustainable mobility part of your working or study day.
A student orchestra performs on steps while a crowd of students in colourful overalls and white caps watches.
Campus, Studies Published:

Students arrange fundraiser to tackle youth loneliness

The fundraising is ongoing until 2 May 2026